ad-100000561

"This helps reduce energy use and keep the water termpreature as high as possible." change to "This helps reduce energy use and keep the water temperature as high as possible. Cavity insulation can be used to meet the pipe insulation requirements, but the pipe must be insulated on all sides (e.g., locate pipe in center of cavity or use additional exterior insulation)."

ad-100000560

"Design the system to minimize the total volume of pipe." change to "Design the system to minimize the total volume of pipe. EA 7.1 (a) can be met using multiple loops that extend from a single water heater. EA 7.1 (b) and (c) can bet met using multiple water heaters."

ad-100000558

"No additional points are available for exemplary performance." change to "No additional points are available for exemplary performance. Projects that exceed the credit requirements are encouraged to use the performance pathway in EA 1.2."

ad-100000415

Replace the sentence and table below the resource with the text "The GC-03 VOC limits applicable for this credit are summarized in Table 1. IEQc4.2 Applicable VOC Limits."

ad-100000135

At the end of the paragraph, insert the text "The SCAQMD Rule 1113 VOC limits applicable for this credit are summarized in Table 1. IEQc4.2 Applicable VOC Limits. "

ad-100000134

Replace the paragraph and table with the text "The GC-03 VOC limits applicable for this credit are summarized in Table 1. IEQc4.2 Applicable VOC Limits."

ad-100000426

Replace the third bullet item with the following text:
• In mechanically ventilated buildings, each ventilation system that supplies outdoor air shall comply with the following:
o Particle filters or air cleaning devices shall be provided to clean the outdoor air at any location prior to its introduction to occupied spaces.
o These filters or devices shall be rated a minimum efficiencyreporting value (MERV) of 13 or higher in accordance with ASHRAE Standard 52.2.

ad-100000425

At the end of the paragraph, add the following text:Mineral-based finish flooring products such as tile, masonry, terrazzo, andcut stone without integral organic-based coatings and sealants andunfinished/untreated solid wood flooring qualify for credit without any IAQtesting requirements. However, associated site-applied adhesives, grouts,finishes and sealers must be compliant for a mineral-based orunfinished/untreated solid wood flooring system to qualify for credit.