Forum discussion

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control

How can I provide blower door test results before occupancy?

Hi, On the credit form I must upload blower door test results but this credit is a design phase credit and the test is only after construction is complete. Can someone share how they solved this conflict? Thanx

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 07/17/2013 - 01:53

A design phase credit does not have to be submitted at the design phase—it could be more appropriate to submit after construction, depending on your compliance path. I would simply submit after you have your testing results.

Sun, 08/04/2013 - 07:27

Good Morning, Our problem is that we have a design and construction compliance path. If we wouldn't supply the blower door test results, the credit's demands are not met. Thanks

Fri, 09/27/2013 - 20:58

You can defer the design credit review and submit it with the construction credits. As I recall, you simply do not mark it as complete.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.