Stair Pressurization Fans and Booster pumps

NC-2009 EAc3: Enhanced Commissioning
posted by Bob Crowell on May 29, 2013, 5:05 pm

Are the following systems required to be tested under the LEED Commissioning Scope?
1. Stair Pressurization Fans
2. Domestic Water Booster Pumps
3. Grey water...

Last reply: Peter Dishno, Jul 12, 2013, 10:56 am

Testing Adjusting & Balancing (TAB)

NC-2009 EAc3: Enhanced Commissioning
posted by Michael Murphy on Jul 8, 2013, 4:35 pm

Are there any LEED specific requirements for TAB work?

Last reply: Scott Bowman, Jul 10, 2013, 8:57 am

Can we go for enhanced commissioning after start of operation

NC-2009 EAc3: Enhanced Commissioning
posted by Abdulrahman Sherazy on Jun 11, 2013, 12:54 pm

Our client have decided suddenly to go for enhanced...

Last reply: Scott Bowman, Jun 11, 2013, 2:17 pm

CxA Experience

NC-2009 EAc3: Enhanced Commissioning
posted by Ameet AA on Apr 29, 2013, 8:40 am

LEED online template/ form require the following:

"Enter information for two projects commissioned by the...

Last reply: Scott Bowman, Jun 7, 2013, 10:29 am

ASHRAE/IECC Compliance for AHU's, RTU's and Heat Pumps

NC-2009 EAc3: Enhanced Commissioning
posted by Peter Dishno on Jun 6, 2013, 12:33 pm

Hello Design Review Experts,

During a design review for a residential high rise, we noted that several areas of common space did not seem to have the capacity to use an economizer, Demand...

Last reply: Scott Bowman, Jun 7, 2013, 10:21 am

Same firm as sub-contractor and CxA

NC-2009 EAc3: Enhanced Commissioning
posted by Sally Marr on May 22, 2013, 5:10 pm

I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing. The owner would like to hire this same firm to do both...

Last reply: Scott Bowman, May 22, 2013, 5:46 pm

Building Envelope Commissioning LEED required test methodology

NC-2009 EAc3: Enhanced Commissioning
posted by Pablo Fortunato Suarez on Nov 22, 2012, 1:59 am

Our project has included Building Envelope Commissioning as part of the scope of Enhanced Commissioning plan. My queries:

1) This is to seek confirmation if the test methodologies listed...

Last reply: Brett Farbstein, May 17, 2013, 4:10 pm

(Jacob) Labs and Other Energy Intense Areas to be Included?

NC-2009 EAc3: Enhanced Commissioning
posted by Brett Beckemeyer on May 2, 2013, 3:47 pm

Susan Walter HDR LEEDuser Expert 1299 thumbs up May 3, 2013- 8:24 am Why wouldn't you commission these systems? Or are you posting in the wrong forum? For EAc3: commission your special...

Last reply: Brett Beckemeyer, May 3, 2013, 9:27 am

Document review

NC-2009 EAc3: Enhanced Commissioning
posted by Adam Rustige on Jan 7, 2013, 9:30 am

Is reviewing I&O manuals and as-built drawings a requirement for enhanced...

Last reply: Scott Bowman, Jan 7, 2013, 10:10 am

In-house CxA with In-house Design, MEP, and Construction Teams

NC-2009 EAc3: Enhanced Commissioning
posted by Simon Sue on Dec 5, 2012, 3:03 am

We're under a scenario that a developer (owner) has in-house design team, in-house MEP team, and in-house construction team working on a single project. In other words, the developer is the owner...

Last reply: Scott Bowman, Dec 5, 2012, 8:26 am