Forum quick links
Life Cycle Assessment all or none points
NC-v4 MRc1:Building life-cycle impact reductionposted by Katie Vasbinder on
for the Life Cycle Assessment is it all 3 points or none? so you cannot get 1 or 2?
Public transit reductions due to COVID
NC-v4 LTc5:Access to quality transitposted by Erin Holdenried on
During the COVID pandemic, there has been a reduction in frequency of public transportation. Are projects permited to use pre-pandemic rates when calculating number of trips, as the rate
Check out the new White House Fact Sheet on Buildings
posted by Mary Ann Lazarus on
Hi Fellow SDLers: Just wanted to make sure everyone saw the terrific initiatives that the White House announced last week:
Definition of utility room
NC-v4 WEp2:Indoor water use reductionposted by Rachael McGinley on
unobstructed views, floating ceilings, window effective head height
CI-v4.1 EQc8:Quality Viewsposted by Kristen Magnuson on
Hello LEED Community,
LEED OnLine now LEED Off Line?
posted by Kelly Ingalls on
LEED On Line Version 2009 is no longer functional?
Option 2 Examples?
NC-v4.1 MRc4:Material Ingredientsposted by SIG - Sustainability Main Account on
We are looking for examples for Option 2 for:
- Material Ingredient Screening and Optimization
- Advanced Inventory & Assessment (HPD or Manufacturer Inventory)
Entryway system between warehouse and office space
Warehouses-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Rachael McGinley on
For a warehouse project "Entryway systems are not required at doors leading from the exterior to the loading dock or garage but must be installed between these spaces and adjacent office areas."