Forum quick links
LEED Site Boundary
posted by Chris DeVolder on
Great forum and good information shared has answered a number of our questions, thanks! On the site boundary for an urban campus public assembly building we're still not 100% on how to draw it.
WEp1 Authentication of the date and scope of plumbing fixtures
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by fareed shariff on
I am currently engage with a LEED EB O&M project located in the UK.
Lg AHU serving multiple floors, perform calcs at zone level?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by AAME User on
I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED EBOM IEQp1. The project consists of two high rise office buildings.
Option 2/ Path 2- Square Footage
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Dominique Arrieta on
Our engineer used the net SF for this calculation instead of the gross SF which matches the PI forms. I know this will be a red flag, but does anyone know if this will be acceptable?
Unixes Restrooms with Dual Flush Toilets
CI-2009 WEp1:Water use reductionposted by Michelle Rosenberger on
I see some discussion on the NC2009 forum about this issue but no real resolution.
FSC - Value of Wood
NC-2009 MRc7:Certified woodposted by matthew convery on
I have a major window supplier that is providing us FSC certified wood windows. They are charging us a $9,500 fee above and beyond the typical window cost for "FSC paperwork".
Carpets and PI Form 5
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Eleni Thomidou on
Hi! In our project there are no carpets in our scope but there might be in the buildouts for tenants spaces.
Signage Requirement
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Erin Cowan on
Is policy verbiage detailing the communication of no-smoking policy by signage strategically throughout a campus acceptable in place of actual drawings or photos?
Existing Computers/ New Computers
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Dominique Arrieta on
We have a renovation project at a college where we have a large number of existing computers, monitors and printers that were excluded from the ENERGY STAR calculations.
Other low emission certifications
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Mathilda Jonsson on
Hi all! My projects is located in Sweden and therefore many of the flooring products is manufracted here.