Topic | Recent |
---|---|
DES Option 1- Baseline System Heating Type ClarificationNC-2009 EAp2: Minimum Energy Performanceposted by Mike Ramos on Nov 2, 2015, 11:59 am
We're using Option 1 of the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Construction" document to comply with EAp2 / EAc1. Our proposed building will... Last reply: Marcus Sheffer, Nov 2, 2015, 12:59 pm |
|
How to deal with a hotel.NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Susan Di Giulio on Jul 24, 2015, 5:20 pm
Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach? It seems like, for this credit, regardless of the area of... Last reply: Akshat Patel, Oct 30, 2015, 3:06 pm |
|
Gym Floor PaintsSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Shelley White on Oct 23, 2015, 9:06 am
Does anyone know if the graphic arts coating... Last reply: Jon Clifford, Oct 29, 2015, 8:07 pm |
|
DES Option 1- Baseline System Heating Type Modeling GuidanceHealthcare-v2009 EAc1: Optimize Energy Performanceposted by Mike Ramos on Oct 29, 2015, 7:43 pm
Hi all, I'm hoping someone can clarify how to model the ASHRAE Baseline systems in compliance with the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and... |
|
Light meter phone appsNC-2009 IEQc8.1: Daylight and views - daylightposted by Ben Thompson on Oct 19, 2015, 11:06 am
Hi all, I'm going to do the measurement method for the first time, and was looking into using a light meter app on my phone to do it- would this be acceptable? Does anyone have any... Last reply: Joyce Kelly, Oct 29, 2015, 12:27 pm |
|
Excluding demand for occupancy sensors in retail sales areaRetail-CI-v2009 EAc1.2: Optimize energy performance - lighting controlsposted by Eleftherios Zacharakis on Oct 28, 2015, 4:03 pm
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor. Can... |
|
Space Usage- Occupant TypeNC-2009 PIf3: Occupant and Usage Dataposted by Akshat Patel on Oct 26, 2015, 2:39 pm
I'm having trouble deciding what to mark for the first item in the form: Occupant Type. My project is a hotel new construction. I was thinking of checking the box for "Other:" and writing... Last reply: Akshat Patel, Oct 28, 2015, 10:50 am |
|
VOC Limit- Thread Cutting OilsNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Jason Biondi on Oct 26, 2015, 11:43 am
What is... Last reply: Jon Clifford, Oct 26, 2015, 11:35 pm |
|
Existing building infiltration ratesNC-2009 EAp2: Minimum Energy Performanceposted by Mike Fortier on Oct 22, 2015, 4:42 pm
We are working on a major renovation of an existing building which includes removing the facade and replacing it with a highly efficient and tightly sealed facade system. Has anyone successfully... Last reply: Marcus Sheffer, Oct 26, 2015, 11:06 am |
|
Default Tenant Receptacle LoadsCS-2009 EAp2: Minimum Energy Performanceposted by Mary Kay Gonzalez on Oct 21, 2015, 11:16 am
On a C&S healthcare building, we simulated the receptacle load based on CS Appendix 2, Table 1, as the appendix directed. The reviewer commented that the value of 1.5w/sf was higher than the... Last reply: Marcus Sheffer, Oct 22, 2015, 3:26 pm |