LEED Interpretation: Effective Date
posted by Pat Thomas on
What is the ruling on when a LEED interpretation is effective??
Bathrooms and Storage rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
According to the IEQ space matrix bathrooms and storage rooms are excluded from VRP calculations for IEQp1, would they still be excluded from 100% OA systems?
IEQp1-A1 Statement "Would need over 100% OA Intake"
NC-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
Our project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the end of the IEQp1-A1 VAV data input form.
Dual Shower Heads in Luxury Hotel Suite
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Victoria Civitillo on
My project, a luxury hotel, wants to put multiple shower heads in their presidential suite.
Contacting the LEED reviewer
posted by Todd Bundren on
Is there a process in place to contact our LEED reviewer?
Mechanical equipment as source of contamiants
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Gustavo De las Heras Izquierdo on
Two more questions: 1.Since legionella is a concern in cooling towers: should mechanical equipment such as cooling towers and/or chillers be considered as a source of contaminants?
Other contaminants
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Gustavo De las Heras Izquierdo on
Hallo, we are working in a project located outside the US. We have found local source of data for most of the air contaminants listed by NAAQS.
Water Performance Measurement Innovation approach for BD+C
EBOM-2009 WEc1:Water Performance Measurementposted by Courtney France on
Per the LEED Credit Library, there seems to be confusion, or room for interpretation, on how to pursue Whole Building Water Performance Measurement for an Innovation credit in BD+C projects.
Using well water for WEc2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Karen Stewart on
Our MEP has recommended drilling a well and using local well water to flush the tolleits instead of using municipally supplied potable water.
Attached roofs to the new constucted building
NC-2009 SSc7.2:Heat Island Effect—Roofposted by esra ozkonuksever on
hi everyone, i m working on project where there is a security check point seperate from the original building and a single floor entrance attached to the 3 floor building.