We have a CS project with no signed tenants yet. The owner is providing central restrooms and showers for all of tenants in the base CS project. The tenants will only be allowed to install kitchen sinks for future breakrooms. Since we have to add future kitchen sinks to the fixtures being used at baseline flowrates under Tenant Neutral anyways, requiring tenants to provide 1.5 gpm kitchen sinks would actualy help us gain an additional point with the CS WEp1/WEc3 credits. If the lower flow kitchen sinks are a part of the tenant lease agreement, do we also have to require the tenant to follow EAp2 and EAc1 requirements under Case A? Basically, can we do either credit (water or energy) or do we have to require both under Case A?