Fixtures included in WEp1.

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Bernardo Ruiz Montoya  on 

Hi, I believe that I already know the answer but I want to present my doubt to you as a double-check.

4
Tue Dec 2, 2014, 4:09 pm

Energy Model Scope - Shared HVAC Plant

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  TOMAS URIBE  on 

Hello there. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.

3
Electrical Design Engineer
Pakistan Green Building Council
LEEDuser Basic Member
0 thumbs up
Tue Dec 2, 2014, 3:57 pm

Exterioir Lighting - Non tradable

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, In the project I'm modeling, in the Proposed project there is a Building facades exterior lighting which LPD is bigger than the allowed values of 0.2 W/ft2.

5
Tue Dec 2, 2014, 2:29 pm

Definition Parking space

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Hanne Goa  on 

Is car space for goods deliveries considered parking space aswell? This is a place for pick up and delivery of goods only (parking not allowed) Thank you!

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Dec 1, 2014, 8:58 am

USGBC DES Guidance - Option 1

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I just want to verify one thing regarding DES Option 1 (building stand-alone scenario): The cooling & heating are modeled as purchased energy (with identical energy rates $) in both

2
Mon Dec 1, 2014, 12:06 am

Do drawings need to have imperial units?

NC-2009 PIf4:Schedule and Overview Documents
posted by  Nicole Kimoto  on 

I'm working on a federal project, and all dimensions are currently in metric. Does anyone know if LEED now accepts this or do I need to change to imperial units?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Nov 28, 2014, 10:12 pm

new files after D&C Preliminary Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  jorge calderon  on 

In response to the preliminary review, before final review, Should I erase all wrong documents and just keep the new updated files?

3
Thu Nov 27, 2014, 6:57 pm

Thank you all

General forums
posted by  Rick Fedrizzi  on 

Dear LEED Users,

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Tue Nov 25, 2014, 7:51 pm
2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Tue Nov 25, 2014, 7:00 pm

Process Load for Manufacturing

NC-2009 EAp2:Minimum Energy Performance
posted by  Panupant Phapant  on 

Dear All, I have some question about my project, Our project is a cosmetic factory. Can I assume this project to Light Manufacturing type?

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Tue Nov 25, 2014, 2:23 pm