CS-2009 EAc3:Enhanced Commissioningposted by Michael E. Edmonds-Bauer on
We are done with our commissioning process and almost ready to submit for preliminary construction review, however the systems manual (Upload EAc3-1) is develop in Spanish language since it is the
Monitoring System
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Marina Andrade on
Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.
Garage below grade
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by FABIO VIERO on
Hi All, I'm now working on a project under LEED certification which aims to pursue this credit. This project has an external parking area (which is included in the LEED Boundary) above grade and ex
Modeling Radiant Panels with DOAS
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Since eQUEST is unable to model dedicated outdoor air system linked to the radial panels, we modeled DOAS units by creating “dummy zones” within the model.
Room exhaust fan energy process or not?
NC-2009 EAc1:Optimize Energy Performanceposted by Haojie Wang on
I remember seeing from somewhere that if the exhaust fan is not interlocked with the HVAC, it should be considered a process load and modeled the same in proposed and baseline.
Exhaust fan not interlocked with HVAC: Process energy or not?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I remember reading it somewhere that exhaust fan that is not interlocked the the HVAC should be process energy (room exhaust).
Storage Room with a small window
NC-2009 IEQp1:Minimum IAQ Performanceposted by Orçun Özhelvaci on
Hi everyone, Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question.
Supplemental Calculation Spreadsheet
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by shane lucero on
Hello, Where would I find the Supplemental Daylight and Views Calculation Spreadsheet for v2009 (LEED Online states it's "found under 'Credit Resources'")? Thank you.
Energy Star Portfolio Manager
Schools-2009 EAc5:Measurement and Verificationposted by Becky Dix on
Is it possible to achieve one point of this credit (like you can for NC) by just registering the project with Energy Star Portfolio Manager?
LEED Credit Timeline
posted by Brenna Martin-Shaffer on
During the process of our split submission information was submitted to GBCI that affected both a prerequisite as well as a credit we were pursuing.