Systems manual

CS-2009 EAc3:Enhanced Commissioning
posted by  Michael E. Edmonds-Bauer  on 

We are done with our commissioning process and almost ready to submit for preliminary construction review, however the systems manual (Upload EAc3-1) is develop in Spanish language since it is the

4
Tue Mar 24, 2015, 10:58 pm

Monitoring System

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Marina Andrade  on 

Hi! In the project we have not a BMS system to monitor energy consumption but the electric company will be regularly measured.

8
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Tue Mar 24, 2015, 5:59 pm

Garage below grade

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  FABIO VIERO  on 

Hi All, I'm now working on a project under LEED certification which aims to pursue this credit. This project has an external parking area (which is included in the LEED Boundary) above grade and ex

2
Tue Mar 24, 2015, 5:58 pm

Modeling Radiant Panels with DOAS

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Since eQUEST is unable to model dedicated outdoor air system linked to the radial panels, we modeled DOAS units by creating “dummy zones” within the model.

3
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Tue Mar 24, 2015, 5:35 pm

Room exhaust fan energy process or not?

NC-2009 EAc1:Optimize Energy Performance
posted by  Haojie Wang  on 

I remember seeing from somewhere that if the exhaust fan is not interlocked with the HVAC, it should be considered a process load and modeled the same in proposed and baseline.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 24, 2015, 5:32 pm

Exhaust fan not interlocked with HVAC: Process energy or not?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I remember reading it somewhere that exhaust fan that is not interlocked the the HVAC should be process energy (room exhaust).

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 24, 2015, 4:18 pm

Storage Room with a small window

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Orçun Özhelvaci  on 

Hi everyone, Although I read almost all the comments related with the ventilation requirements of the storage rooms, I could not find the exact answer for my question.

3
LEED Coordinator
Limak Construction Company
LEEDuser Basic Member
0 thumbs up
Tue Mar 24, 2015, 1:39 pm

Supplemental Calculation Spreadsheet

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  shane lucero  on 

Hello, Where would I find the Supplemental Daylight and Views Calculation Spreadsheet for v2009 (LEED Online states it's "found under 'Credit Resources'")? Thank you.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Mar 24, 2015, 1:22 pm

Energy Star Portfolio Manager

Schools-2009 EAc5:Measurement and Verification
posted by  Becky Dix  on 

Is it possible to achieve one point of this credit (like you can for NC) by just registering the project with Energy Star Portfolio Manager?

6
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Mon Mar 23, 2015, 8:17 pm

LEED Credit Timeline

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Brenna Martin-Shaffer  on 

During the process of our split submission information was submitted to GBCI that affected both a prerequisite as well as a credit we were pursuing.

3
Mon Mar 23, 2015, 6:32 pm