Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Furniture Cost

CI-2009 MRc5:Regional Materials
posted by  Morteza Kasmaei  on 

In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Apr 7, 2015, 11:19 pm

Semi-permanent streams

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Apr 7, 2015, 10:29 pm

documentation guidance updated

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Tristan Roberts  on 

LEEDuser has had a lot of comments from you that documenting this credit was confusing, particularly when environmental practices aren't employed 100% of our time.

5
Tue Apr 7, 2015, 4:20 pm

Energy modeling of an open roof stadium in a hot climate

NC-2009 EAp2:Minimum Energy Performance
posted by  Mario S.  on 

Good day, I have the following question regarding the energy modeling of a very large soccer stadium in a hot climate: My proposed design involves floor mounted and side mounted jet fans that are

3
Default Avatar
LEEDuser Basic Member
26 thumbs up
Mon Apr 6, 2015, 4:20 pm

SSpc14 Walkable project Site

Pilot-Credits PC14:Walkable Streets
posted by  Amanda Johnson  on 

I am trying to register for this Pilot Credit (which is not listed as closed) Both LEED Online and LEED User link to the USGBC Credit Library, but in the credit Library I find no link to register.

3
Fri Apr 3, 2015, 3:28 pm

Developement on EAp2?

General forums
posted by  Jean Marais  on 

Are there any plans to do the same sort of thing with EAp2?

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 3, 2015, 12:15 pm

Actual Material Cost vs. Material Cost: what's the difference?

NC-2009 MRc4:Recycled Content
posted by  Marcio Alberto Casado Pereira  on 

We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.

20
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Fri Apr 3, 2015, 1:30 am

Categorizing a LEED project

LEED Rating System Selection
posted by  Adi Negara, LEED AP BD+C  on 

Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow

2
Thu Apr 2, 2015, 2:48 pm

LEED NC or EBOM ?

LEED Rating System Selection
posted by  Fabio Frescia  on 

Hi, We just got a project here in Thailand that just started, where our client would like to achieve a LEED certification. It's an existing resort and they want to renovate it.

3
PM, LEED AP
Arcadia (Thailand) Company Limited
LEEDuser Basic Member
0 thumbs up
Thu Apr 2, 2015, 2:35 pm

District cooling system with different construction planning

NC-v4 EAp2:Minimum energy performance
posted by  Jeroen Sap  on 

I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).

3
LEED AP BD+C
Deerns Nederland B.V.
LEEDuser Basic Member
2 thumbs up
Wed Apr 1, 2015, 11:32 pm