Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

FSC MIX

NC-2009 MRc7:Certified Wood
posted by  jorge calderon  on 

Hello! I´m documenting a floor that is FSC MIX, does it means that I can count it as 100%? I´m not sure because the label only says MIX, not FSC Mixed Credit, neither FSC Mixed (NN)%. Thanks in

7
Default Avatar
Manager, Sustainability and Technical Marketing
Masonite Architectural
LEEDuser Basic Member
57 thumbs up
Wed May 27, 2015, 2:30 pm

FTEs

NC-2009 PIf3:Occupant and Usage Data
posted by  Ivan Romero  on 

The client has stated an FTE of 24 for the building as 24 reflects current staff and all that the departmental operational budget can accommodate.

3
Default Avatar
Senior Project Manager
KMD Architects
LEEDuser Basic Member
3 thumbs up
Wed May 27, 2015, 1:57 pm

Compliance documents upload

ND-v2009 GIBc15:Recycled content in infrastructure
posted by  Nader NAKIB  on 

WE are working on a LEED ND project and are currently incorporating the LEED requirements in the project specifications.

6
Wed May 27, 2015, 7:03 am

Commissioning DES if waste heat is recovered from process

NC-2009 EAc3:Enhanced Commissioning
posted by  Dave Hubka  on 

Our project includes an existing (more than three years old) DES that serves both the process equipment and building htg/clg loads.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue May 26, 2015, 9:40 pm

Baseline HVAC system choice

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue May 26, 2015, 3:02 pm

G3.1.1 Exception for system 3

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a college building with around 50% of its floor area being a gym, which is sized to its maximum capacity during graduation.

3
Tue May 26, 2015, 1:51 pm

Chiller IPLV

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

I have a query on ASHRAE 90.1 2010. There are 2 paths to specify the chiller COP. How do we enter the part load values in the simulation software? ASHRAE only mentions the IPLV.

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Mon May 25, 2015, 6:24 am

Can I lock the credits not to be touched by other team members ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Is there any feature in LEED online to lock the credits not to be changed by other team members ?

2
Default Avatar
LEEDuser Expert
472 thumbs up
Sun May 24, 2015, 10:27 pm

Cleaners

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Pia Öhrling  on 

Should a cleaner used before the adhesive (to make the Surface clean) fullfill IEQc4.1? If it should which category should be used?

2
Sat May 23, 2015, 12:29 am

Filed (2)exemp. performance credit under (1) ID in case one fail

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 6:52 pm