A Learning Center to Support Farming on Prime Farm LandNC-2009 SSc1: Site Selectionposted by Brooks Critchfield on Jul 8, 2011, 9:02 am
We have a project in a rural area sited on an existing farm. The project is very small in scale and will have a very small development footprint to preserve the land and to make as little impact... Last reply: Steve Loppnow, Feb 26, 2012, 6:06 pm |
|
LEED boundary questionNC-2009 SSc1: Site Selectionposted by Mark Meaders on Aug 29, 2011, 11:44 am
I am working on a project that is being completed in 2 phases. Last reply: Steve Loppnow, Feb 26, 2012, 5:42 pm |
|
ASHRAE 90.1-Envelope Fenestration & Skylight Fenestration areaNC-2009 EAp2: Minimum Energy Performanceposted by Natalie Tan on Feb 24, 2012, 4:37 pm
Hi, We have a new 400m2 dining hall project in Climate zone 1, and would like to seek advice on the compliance for having to meet the maximum 40% for vertical fenestration area as well as not... Last reply: Marcus Sheffer, Feb 24, 2012, 6:16 pm |
|
Contradiction for Pressurized HallwaysNC-2009 IEQp1: Minimum indoor air quality performanceposted by Omer Moltay on Feb 24, 2012, 5:16 pm
Some sources (including LEED User) suggest that hallways pressurized with mechanical ventilation can be used to ventilate spaces in dwelling units that are adjacent to the unit entry door through... |
|
CS for a single tenant build-to-suitLEED Rating System Selectionposted by Ben Tucker on Feb 23, 2012, 6:26 pm
Our client (building owner) has a tenant interested in an 80,000 sf existing building. To accomodate the tenant's space needs as well as their requests for a LEED building, our client plans to... Last reply: Ben Tucker, Feb 24, 2012, 3:35 pm |
|
Minimum ventilation in Storage, electrical rooms, lift m/c roomsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Arub Vijay on Feb 21, 2012, 5:58 am
Do we need to comply with the ventilation rates in Table 6-1 (ASHRAE 62.1-2007) for electrical rooms, lift machine rooms, electrical rooms etc? Last reply: Omer Moltay, Feb 24, 2012, 2:59 pm |
|
Ice Makers- Bane of my ExistenceCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Julie Hendricks on Oct 12, 2011, 11:44 amthat in this forum we cannot approve project teams' strategies, only offer guidance. If you would like a strategy pre-approved please submit a CIR. For more information about CIRs refer to this link:... Last reply: Jeremy Muenz, Feb 24, 2012, 2:26 pm |
|
Flooring Systems Tracking FormNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Ara Massey on Feb 24, 2012, 12:40 pm
The "Sample Letter to the Contractor" included in the Documentation Toolkit references a "Flooring Systems Tracking Form" yet I cannot find one included in the toolkit. Is this available?... |
|
Do aerators count?CI-2009 WEp1: Water Use Reductionposted by Diana Nezamutinova on Feb 24, 2012, 4:41 am
Would... Last reply: Manny Iglesia, Feb 24, 2012, 12:36 pm |
|
A client with ongoing site works asks about LEED feasibilityNC-2009 SSp1: Construction Activity Pollution Preventionposted by Mauricio Ramirez on Jan 25, 2012, 10:13 am
The owner of a project is considering the possibility of the project to become LEED Certified. The current works on site include a excavation of a hill, and the works had been conducted following... Last reply: Tristan Roberts, Feb 24, 2012, 11:35 am |