Option1-simulation. The result of ecotect shows the qualified regulary occupied area is 84% at 9 am, 83% at 3 pm. I took 83% as simulation result.
But I got review technical advice like this:'The simulation report only indicates the compliant areas for 9 a.m. and 3 p.m. individually, and the lower value has been used as the total compliant area. Revise the
spreadsheet to ensure that only the area that is compliant at both 9 a.m. and 3 p.m. on September 21st, not at one time or the other and not the average compliant area, has been reported as meeting the daylight requirements.'
As the outcome of ecotect only shows the percentage of compliant area at 9 am or 3 pm individually. How can I get the percentage of qualified area at both 9 am and 3 pm?