Phased Flush Out
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.
Final Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Benjamin McGrath on
For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.
IEQ c4.2 Paints - Laboratory tests according to SCAQMD Rule#1113
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andrea Tayah Esperão Malta de Campos on
In a LEED 2009 CS project in Brazil and a Epoxi Paint was used in a parking garage.
LED integrated in facade window frame/ MLO lighting zone
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport.
Vulnerable Populations
NC-v4 SSc1:Site assessmentposted by Saxon Gibbs on
How does LEED define vulnerable populations and what is the best way to assess proximity to them?
Building Footprint
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Jaesik Lim on
Hi, all Our team had a technical advice from USGBC reviewer, the comment is like below... " The LEED form indicates a total roof area (excluding mechanical equipment, photovoltaic panels, and skyl
Rainwater Harvesting - Irrigation and Reclaimed Water?
EBOM-v4 WEc4:Water meteringposted by ARDOR GREEN on
We have an office project that will have some large rainwater collection tanks that will be used for irrigation.
Registering an individual project under a Campus project
posted by Sean Quinn on
Does anyone know if we can register an individual project under a master site with only the master site name and ID information and without actually having access to the master site project on LEED
Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.
View Preserving Shade
Retail-CI-v2009 IEQc8.1:Daylight and views - daylightposted by Lon Stephenson on
Is there any criteria as far as what a View Preserving Shade actually is? There are openness factors as low as 1%; yes, you can see through them, but not much.