Warehouses-NC-v4 WEc2:Indoor water use reductionposted by Helena Garcia on
Dear Leed users, We are doing a warehouse project in Spain.
Innovation Credit Asphalt?
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Marissa Hebert on
I'm using this credit for an Innovation in Design point for a new building/major renovation.
Discharging Storm water at a later stage
CS-v4 SSc4:Rainwater managementposted by Patrice McVeigh on
Under Version 3 is was acceptable to retain storm water run-off in tanks to discharge in to storm water sewers at a later date, is this still acceptable under V4?
Pool Deck
NC-v4 SSc3:Open spaceposted by Joseph Snider on
We understand that a swimming pool itself does not contribute,and we have been told we can exclude the pool from the calculations. Can we include the pool deck area itself?
Airflow measurement device serving multiple AHUs?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mike Fortier on
Hello, Is it okay to install one airflow measurment device within an outdoor air intake that serves multiple AHUs or does each AHU need to have its own airflow measurement device? Thanks!
At the discretion of the permit holder
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Ashley Hu on
Hi Everyone, here's another question. The campus guidance from the LEED Canada Reference Guide states the following: " It is acceptable to achieve a Campus Shared Infrastructure compliance path
Baseline DCV modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The following issue is somehow not clear and any support is highly appreciated. The project belongs to system 7 (LEEDv2009) and has to be modeled with one AHU system per floor.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
Waste Receipts
NC-2009 MRc2:Construction Waste Managementposted by Rashed Al Nasa'a on
The contractor on our project has established a weighing station for trucks and vehicles within the project boundary and is planning to use it to measure the amount of diverted waste for MRc2.
Irrigation type definitions
NC-v4 WEp1:Outdoor water use reductionposted by Jens Apel on
Does anyone know if there are definitions for the different irrigation types? Especially the differences between the two drip types would be of interested. Thanks, Jens