Forum quick links
Renewable sources area = calculation exception?
NC-v4 SSc3:Open spaceposted by Kristina Pobre on
Is the area for on-site renewable sources an exception to the calculation from the 30% site area?
Exemplary performance credit
CI-v4 LTc3:Access to quality transitposted by Richard Woodward on
Is an exemplary performance credit available for CI certifications? Double the highest service point threshold?
Adhesive for acoustic insulation on ventilation instalation
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Andrzej Gutowski on
Doea anyone could advise what category of adhesive would be that? Would that be up to material used for acoustic insulation?
Horizontal and vertical footcandles documentation
CS-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
Hello, I have a question regarding the horizontal and vertical footcandles. In our understanding, the horizontal footcadle means that the illuminaiton is measured at horizontal plane (i.e.
Glisofat
EBOM-v4 SSc5:Site managementposted by Emmanuel Pauwels on
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?
Stores ventilated with air from common areas in a mall?
CS-v4 EQp1:Minimum indoor air quality performanceposted by Billy Condor on
Hello, I'm the CxA and energy modeler for a new big C&S v4 mall project.
Project size increase
CS-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.
When covering a wide range of products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
A company is planning to publish an EPD(s) for their gypsum board products.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.