Forum quick links
Pressurization requirements in LEED v4
NC-v4 EQp2:Environmental tobacco smoke controlposted by Judhajit Chakraborty on
We have a project where the hallways are pressurized to provide ventilation air thru door undercuts.
Vertically Attached Project
CS-v4 EAc2:Optimize energy performanceposted by LEED Pro Consultant on
Our team is working on a project which follows a vertically attached approach.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
asbestos contamination
CI-v4 INc1:Innovationposted by emily reese moody on
I have a CI project that has asbestos in the existing space that must be addressed for our project.
Future-proofing LEED certification - Iran
posted by Meike Borchers on
I have a slightly different question in regarding to certifiable projects.
Material content of the product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
We'd like to know how important it is to state the respective materials and their respective weights in an EPD.
Locker rooms
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Agnieszka Rylska on
Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.
Refrigerant pipe insulation adhesive in split AC units
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Jorng-ren Chern on
Currently, we are working on a university extension project.
Envelope CxA Requirements
NC-v4 EAp1:Fundamental commissioning and verificationposted by Risto Beatty on
Do the rules for who can be a CxA also apply to envelope commissioning? That is, can the envelope consultant on a project also perform the envelope commissioning?
Access to at least 50% of tenant occupant floors
Pilot-Credits EQpc78:Design for active occupantsposted by Christopher Heine on
The credit language states "Buildings must have at least one main stair that enables occupants to travel between the building entrance floor(s), occupant’s own destination floor and common use floo