Outdoor air delivery monitor location?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mindaugas Mi on
Dear Leeduser.com members, who could explain where exactly should the outdoor air delivery monitor should be located? Only at the outdoor intakes?
Control devices required for meeting ASHRAE 55
CS-2009 IEQc7:Thermal Comfort—Designposted by Mindaugas Mi on
Dear Leeduser.com members. We have a question regarding whether we need these controls for meeting LEED credits under v2009 CS version. - Radiator heating system.
Reasonable Site Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by Mindaugas Mi on
Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1.
Airflow monitoring device
CI-v4 EQp1:Minimum indoor air quality performanceposted by Natalia Pineyro on
Hello! We are working on a project that is going to install a constant volume system.
Cafeterias with kiosks,
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Aishwarya Balagopal on
We are currently working on a cafeteria project for a campus project. The cafeteria has several food serving kiosks (zones) distributed across the dining floor plan.
Military Dormitories
NC-2009 SSc2:Development Density and Community Connectivityposted by Paul Zanglin on
Does an area with military dormitories meet the intent of a 'residential area'? The military dormitories house single service members and geographical bachelors.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
EAcp66 Community Contaminant Prevention- Airborne Releases
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team found the Community Contaminant Prevention- Airborne Releases to be a great pilot credit to continue working toward a more pure indoor air quality.
Appealing an EP
posted by Charles Nepps on
We had one of 3 EP's denied during our final review.
Site Boundary Including Other Structures
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Vicki Rybl on
We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.