Trying to get EQc1 without installing a visible alarm

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ira Ben-Reuven  on 

We are working to certify a NC. The tenants will not allow us to install a alarm in the presence of the customer.

1
Tue Dec 13, 2016, 4:42 pm

100% OA constant volume enthalpy heat recovery ventilator

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Noriko Nagazumi  on 

Hi, Our project is mechanically ventilated by 100% OA constant volume enthalpy heat recovery ventilator.

1
Thu Jan 26, 2017, 3:45 pm

Non potable water source offsite

NC-2009 WEc1:Water Efficient Landscaping
posted by  Mario S.  on 

Our Project is a NC, part of a university campus. The campus is supplying the project with the pipeline for irrigation. all the water supplied by the campus is Non-potable / reused water.

1
Sat Feb 4, 2017, 1:17 pm

Preferred Parking Spaces Allocation

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Mario S.  on 

Our project is a new shopping mall that includes retail shops, a supermarket, and restaurants. All parking spaces are located in basement floors (basement 1 to 6).

1
Mon Dec 12, 2016, 6:14 pm

Addition to Existing Leed EBOM Building

General forums
posted by  Max Neu  on 

Forgive me if this has been answered, I searched all over and can't find a definitive answer.

0

Lighting power allowance calculations for V4 ID+C Retail

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Joanna Peacock  on 

According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For

1
Wed Jan 18, 2017, 11:46 pm

Final Report

NC-v4 EAc1:Enhanced commissioning
posted by  Colin Grist  on 

Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin

1
Tue Dec 13, 2016, 6:32 pm

renovation of multiple non-contiguous parts of an office

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  Agnieszka Rylska  on 

The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.

0

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1
Tue Dec 13, 2016, 9:56 pm

Industrial zone

NC-v4 LTc3:High priority site
posted by  Charalampos Giannikopoulos  on 

Would an officially designated industrial zone which provides tax incentives to businesses be considered as an eligible "high-priority site" to locate a project on? Thank you.

1
Tue Jan 17, 2017, 4:31 pm