Forum quick links
Transients, visitors and peak visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).
Soil Restauration in vegetated roof
NC-v4 SSc2:Site development - protect or restore habitatposted by Ana García on
Dear All, We are working in a project, in which the whole site was previously developed and paved. All new green areas will be vegetated roofs (project achieves a density of 1.5 floor-area ratio).
EPMD Membrane Adhesive
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Bak on
In FAQs for IEQc4.2 I found an information that the actual weather barrier does not need to comply with the credit. I understand that we can treat EPMD Membrane as weather barrier.
V4 Advanced Energy Metering Template is Protected
NC-v4 EAc3:Advanced energy meteringposted by Steven Wychorski on
Hello The USGBC approved Data template for Building Energy Metering is locked/protected. It only has 2 meter tabs. My project has 60+ different meters to input.
Sounds transmission - Ceilings and Floors
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics calculator expands on the guidance provided in the credit and reference guide with respect to the sound transmission requirements and associated calculations.
Determining STC ratings for ceiling products
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics credit addresses sound isolation purely through composite STC ratings. In my research, I have struggled to find STC ratings for ceiling products.
Phenol Formaldehyde (PF) Resins OK with v3?
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Brian Salazar on
The CI forum seems to have more traffic, so I am reposting here from CS.... Hello - I am working on a project where the subcontractor has requested we approved a product that uses a WBP Phenolic F
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Commingled or Source Separated
NC-2009 MRc2:Construction Waste Managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?