NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jon Clifford on
A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth
VOC Limit for anticorrosive paints
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Kerem Mavioglu on
Is there any other restrictions for anti-corrosive paints other than 250 g/l VOC limit in Leed V4? Is it enough for a paint product to have lower VOC value than 250 g/l to be leed V4 compliant?
Office CS without housekeeping storage room
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Cathy W on
As it is a CS project (office building), the owner is not responsible for hiring housekeeping staff for tenant spaces. There is no housekeeping storage room in the project.
Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
EPA registered chemicals and new UL equivalent of CCD 146
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Pablo Fortunato Suarez on
My queries: A. Would procurement of EPA registered chemicals (not paper), as claimed by supplier, comply with LEED requirements for this credit & contribute to getting LEED points? B.
Outdoor water use to water mirrors in roof
CS-v4 WEp1:Outdoor water use reductionposted by Tobias Berge on
Is small water mirrors situated at the roof included in the credit? The architect has planned a few water mirrors close to a sky bar.
Slab on grade and concrete piers
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Thermal Comfort Control through BMS
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Gray Bender on
Hello, I am looking to understand if it would be acceptable to provide thermal comfort control only through a BMS system for a multi-occupant space.
Registration by Owner or Consultant?
NC-2009 PIf2:Project Summary Detailsposted by Vanessa Montezuma Ramos on
I am not sure if I am in the correct subject, but I did not find any answer or forum subject regarding this particular matter.
Reviewer's comment on MPR2
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Eric Bautista on
I am handling a new LEED building addition horizontally attached to a non-LEED existing building.