Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED CI - HVAC Syatem selection and Fan power Modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  SAMY Chamy  on 

Dear All:- How to select the Baseline HVAC system for LEED CI Project and how I calculate the fan power for fan interlocked with HVAC system Can we us the 7Group fan power calculator for baseline

1
Wed Aug 24, 2016, 2:55 pm

USGBC’s residential midrise simulation guidelines

Mid-Rise-v4 EAp1:Minimum energy performance
posted by  Amber Wood  on 

Where is the guideline document downloadable and does it include appendix B? I've found the residential midrise simulation guidelines in a table here http://www.usgbc.org/node/9462224?view=resource

1
Wed Aug 24, 2016, 4:36 pm

Institute for Research

Healthcare-v2009 SSc2:Development density and community connectivity
posted by  Rachel Manoguerra  on 

Do you think an Institute for Research and Astrology counts as a "school" for community connectivity?

1
Sun Aug 27, 2017, 12:19 am

ENERGY STAR Portfolio Manager

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Gregory Martin  on 

I am currently working on a template and it looks slightly different from the last project I worked on.

1
Wed Jan 18, 2017, 5:07 pm

Green Product- FSC

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.

1
Thu Aug 25, 2016, 2:39 pm

Combination Shower/Bathtub in Dormitory

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vicki Rybl  on 

Hi All, I am working on a project which is a dormitory. Each living unit has a bathroom which, along with a toilet and sink, contains a combination shower/bathtub.

1
Thu Aug 25, 2016, 3:42 pm

EQc5 & Fume Hoods

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Laura Eubanks  on 

In order to meet EQc5 requirements, do science prep rooms have to be independently exhausted even if fume hoods are installed (given deck to deck partitions and self-closing doors are present as we

1
Sun Sep 25, 2016, 4:46 pm

Vertically attached - vertical expansion

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Garrett Ferguson  on 

I have a 4-5 story non-LEED building that will be adding 4-5 stories to the new project. I'm confused as to why they would require that the addition be of different ownership.

1
Wed Jan 18, 2017, 4:22 pm

LEED project with associated Parking Deck

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ashley Love  on 

I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!

1
Tue Jan 17, 2017, 6:12 pm

IEQp1 online form - potential error

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Scott McMillan  on 

We are at Design Appeal stage on a core and shell office project - we have been asked to recalculate ASHRAE 62 compliance based on a theoretical office floor layout incorporating meeting rooms, cor

1
Fri Aug 26, 2016, 7:12 am