Forum quick links
Rainwater for enclosed car park reutilization
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Ricardo Sá on
I'm working in a project where rainwater is collected and stored in storage cisterns.
High-rise Residences: NC or C&S?
posted by Maria Isabel Conde on
Hello, We have a project that wants to pursue LEED v2009 certification. The building is mixed-use but mostly residential (2 levels will be for commercial use, 4 levels for office and approx.
Supermarket in a small neighbourhood
NC-2009 SSc2:Development Density and Community Connectivityposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a
LEED CI - Energy Modeling Terms
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SAMY Chamy on
Dear All:- Greetings I need some clarity in terms in the terms used in "LEED ID + C ref guide page no 172" what is meant by 1.Project area 2.Total Segment area of LEED CI project ECB energy s
Can CARB’s ATCM 93120 (2008).
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Summer Gorder on
Can CARB ULEF (Ultra Low Emitting) composite wood ceiling tiles that meet ATCM 93120 (2008) comply with IEQ credit 4.4?
Tenant with LEED ID&C Certification is moving spaces in building
CI-2009 PIf5:Previously LEED Certified Detailsposted by Summer Gorder on
If a tenant moves spaces within the same building, but would like to maintain their LEED ID&C certification, does anything transfer over to certify their new space?
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Air Cooled Chiller Vs Water Cooled Chiller With Dry Air Cooler
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Has anyone any feedback in modelling either of these two chillers in a 90.1 Energy model.
Occupancy Category
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Meier Corporate Account on
I am working through the Minimum IAQ Performance calculator and I need a recommendation.... Our facility is 105,000 quare feet (ground level).