Forum quick links
cottages on poles on water
NC-v4 MPR1:Must be in a permanent location on existing landposted by Emmanuel Pauwels on
We are looking into the possibility to certify a holiday resort located on an island.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
160815 FLUSH-OUT - LEED V4 IAQ ASSESSMENT PRACTICE EXAM QUESTION
CS-v4 SSc7:Tenant design and construction guidelinesposted by P Beulah on
Please read the query below and explain if I've misunderstood something. The Reference Guidance book clearly states: Option 1 Flush-Out Path 1 Before Occupancy: Total 14,000 cubic ft of outdoor ai
WELL credits and LEED Innovation points
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Meredith Chambers on
Can a WELL credit be used as a LEED Innovation point in v4? If so, can the list shown in Appendix C, Table A2 of the WELL Building Standard v1 Reference Guide be used to show compliance with v4 Pe
SSc4.1
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Magda Aghababyan on
We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.
occupation hours for dormitories
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modelling a student house. In some rooms there is an independent kitchen, while in some other rooms there isn't.
Enhanced Refrigerant Mgmt - Refrigerators & Kitchen Equipment
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Theresa Lehman on
Received the design review comments back for EAp3 and EAc4 regarding refrigerants. The comments said, "...all equipment with one half pound or more of refrigerant must be listed in the form.
EAc5 v2009 putting together M&V at the end of the project
NC-2009 EAc5:Measurement and Verificationposted by Lou Niles II on
We are extremely late in a project and the team believes we intended to attempt EAc5 all along. When is it too late to achieve / document for EAc5 M&V for NC v2009?
CSI MasterFormat necessary in Europe
NC-2009 MRc5:Regional Materialsposted by Paul Deinhofer on
Hello Is it also necessary for projects in Europe to evaluate the material costs using the CSI MasterFormat? Or is there another possibility...? Thanks
Occupancy Count for Residential
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Iris Amdur on
We have a mixed-use (residential, retail, office) project that wants to implement a vehicle sharing program for this credit.