Forum quick links
SSc6.1 Design Storm Interval
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Curtis Dorosh on
Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.
IEQc4.5 Uncertified Furnishings
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Emily Neal on
Hello, I'm a little confused with this credit. I've entered all the information that I have for the systems furniture that is Greenguard or ANSI certified. I have one piece that is not certified.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
All controls provided using customised mobile app
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Yusuf Turab on
We are working on an IT office building that does not have any switches to control lighting.
residential/nonresidential
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Exception a. of G3.1.1 states: "Use additional system type(s) for non predominant conditions (i.e. residential/nonresidential …)".
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.
Demonstrate Savings for CRAC Units
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gabriela Crespo on
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.
Environmental Tobacco Smoke (ETS) Control
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Vanessa W. on
For IEQ P2 Option A - do we need to have performance metrics in the policy we submit? Thank you