Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSc6.1 Design Storm Interval

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Curtis Dorosh  on 

Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.

1
Thu Aug 18, 2016, 3:32 pm

IEQc4.5 Uncertified Furnishings

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Emily Neal  on 

Hello, I'm a little confused with this credit. I've entered all the information that I have for the systems furniture that is Greenguard or ANSI certified. I have one piece that is not certified.

1
Tue Aug 9, 2016, 5:57 pm

Determining Site Boundary on Renovations/Additions

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Andrew Buck  on 

We are working on a Hotel that is both a renovation and major new construction.

1
Tue Aug 9, 2016, 5:58 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am

residential/nonresidential

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Exception a. of G3.1.1 states: "Use additional system type(s) for non predominant conditions (i.e. residential/nonresidential …)".

1
Fri Aug 5, 2016, 11:01 pm

Manufacturing process

NC-v4 EAp2:Minimum energy performance
posted by  ignacio furniés  on 

My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.

1
Tue Aug 9, 2016, 1:56 pm

Demonstrate Savings for CRAC Units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Gabriela Crespo  on 

Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.

1
Sat Aug 6, 2016, 6:33 pm

Environmental Tobacco Smoke (ETS) Control

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vanessa W.  on 

For IEQ P2 Option A - do we need to have performance metrics in the policy we submit? Thank you

1
Wed Jan 18, 2017, 5:24 am