Forum quick links
Energy Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi everyone, I am doing energy modeling for my project in Pakistan and i want to need some clarification and help from seniors: 1) Is it true that for baseline and proposed case HVAC system shoul
Confidential lease agreements cannot be obtained
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Mader on
Our project is an office building with some retail spaces on its lower floors that have already been leased.
Air Filter "Dirty Filter" Allowance in Fan Energy Calcs
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I cannot find where there is any mention about "air filter loading" allowance requirements for fan power calculations.
Daily Use of sink in Dorm Lobby
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Todd Bundren on
Hello, We are currently responding to initial preliminary advise and getting ready to resubmit our responses for a dorm building.
v3 vs. v4 Fundamental Commissioning Scope
CI-v4 EAp1:Fundamental commissioning and verificationposted by Jareb Ketay on
Hi everyone!
Curtain Wall Should Be Exterior Wall or Glazing?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Sara Zoumbaris on
Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!
Cleaning Chemicals
Hospitality-EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Is laundary and kitchen cleaning chemicals included in LEED V4.
producer declaration
CS-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
We received a declaration from a material producer stating that the product "contains ca. 80% recycled content" and "we assume that 50% comes from post-consumer".
Alternative Transportation: Walking?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Janice Rogers on
We are renovating a small health clinic on a small restricted military Post. The people who use this clinic live on Post or are students on Post.
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?