Process Water Reduction

Schools-2009 WEc2:Innovative Wastewater Technologies
posted by  Charles Shinneman  on 

Can this credit be used for process water reduction? Washing machines for example.

1
Sun Aug 27, 2017, 12:13 am

Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?

CI-2009 EAc2:Enhanced Commissioning
posted by  Margaret Montgomery  on 

In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?

1
Tue Jun 14, 2016, 9:49 pm

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by  Yulia Chen  on 

Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

0

Additional Points for Water Reuse

NC-v4 WEc2:Indoor water use reduction
posted by  Soo Choi  on 

I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.

1
Tue Mar 19, 2019, 5:45 pm

Base Case vs Project Case

CS-2009 EAp2:Minimum Energy Performance
posted by  Dana Guzman  on 

Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?

0

EBOMv4 - Streamlined Path option

EBOM-v4 MPR1:Must be in a permanent location on existing land
posted by  Catalyst Partners  on 

EBOMv2009 had a streamlined path option for projects that had previously achieved BD+Cv2009 Certification. Does that still exist for EBOMv4?

1
Tue Jan 17, 2017, 9:01 pm

voc for Damp proofing paints under ground

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  soha yamani  on 

Hi all , do damp proofing paints that are used to paint concrete foundations, retaining walls, and column necks are considered inside the building ?

1
Sat Jul 2, 2016, 4:44 pm

Refrigerant Atmospheric Impact

EBOM-v4 EAc8:Enhanced refrigerant management
posted by  Meier Corporate Account  on 

Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as

1
Fri Aug 19, 2016, 5:06 pm

bike sharing programs

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  cathy keagle  on 

Can a bike sharing program be instituted at a facility that would satisfy or supplement this credit

1
Wed Jun 15, 2016, 6:19 pm

Regularily Occupied or not?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Alex Barrera  on 

I'm working on an industrial building in Virginia. One of the rooms is a Quiet/Sleep room, where employees can rest in between their shifts.

1
Fri Jun 17, 2016, 12:29 pm