Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear all our project is located in a rural area. then agriculture waste (Biomass) is available in anywhere near our site.
Reusing HVAC system from base building
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Michael Wahjudi on
Hi all, I have a question regarding thermal comfort control. If the tenanted area is reusing the HVAC system from base building. Can we be exempted from the individual control requirement?
Controls - Multioccupants space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by SAMY Chamy on
Dear All:- Our project have meeting, conference, training rooms, Canteen (Food), pantry (Coffee stations) The meeting room have one round table with 9 occupants but table is single so we provide
C2C Bronze in LEED v3?
CI-2009 IDc1:Innovation in Designposted by Brian Salazar on
Hi all - I am aware of the calculations for C2C products for ID credits in LEED v3 (Silver, Gold, Platinum).
video conferencing equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Kristen Magnuson on
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.
LEED CREDITS
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by kobby akuffo on
1. What information must you have to complete the calculations for the LEED EQ Credit Low-Emitting Materials Composite Wood and Agrifiber Products. 2.
Basecase System selection
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear All:- Our project is G+3 factory building and a floor area of 1,80,000 Sq.ft 80000 Sq.ft is A/c area and remaining areas are Ventilated by fresh air fans so we take system 06-System 6—Pack
Certification agency meeting the ISO Guidelines
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on
Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide
LEED NCv4 getting harder
NC-v4 SSc4:Rainwater managementposted by Marco Valerio Ceccotti on
Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "natural land cove
n/a
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Marco Valerio Ceccotti on
Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "natural land cove