Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Biomass Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear all our project is located in a rural area. then agriculture waste (Biomass) is available in anywhere near our site.

1
Mon Mar 21, 2016, 10:30 pm

Reusing HVAC system from base building

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Michael Wahjudi  on 

Hi all, I have a question regarding thermal comfort control. If the tenanted area is reusing the HVAC system from base building. Can we be exempted from the individual control requirement?

1
Fri Mar 18, 2016, 4:07 pm

Controls - Multioccupants space

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  SAMY Chamy  on 

Dear All:- Our project have meeting, conference, training rooms, Canteen (Food), pantry (Coffee stations) The meeting room have one round table with 9 occupants but table is single so we provide

1
Mon Mar 21, 2016, 4:15 pm

C2C Bronze in LEED v3?

CI-2009 IDc1:Innovation in Design
posted by  Brian Salazar  on 

Hi all - I am aware of the calculations for C2C products for ID credits in LEED v3 (Silver, Gold, Platinum).

1
Wed Jan 18, 2017, 6:01 am

video conferencing equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Kristen Magnuson  on 

Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.

1
Sun Mar 20, 2016, 11:56 pm

LEED CREDITS

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  kobby akuffo  on 

1. What information must you have to complete the calculations for the LEED EQ Credit Low-Emitting Materials Composite Wood and Agrifiber Products. 2.

1
Mon Mar 21, 2016, 6:14 pm

Basecase System selection

NC-2009 EAc1:Optimize Energy Performance
posted by  SAMY Chamy  on 

Dear All:- Our project is G+3 factory building and a floor area of 1,80,000 Sq.ft 80000 Sq.ft is A/c area and remaining areas are Ventilated by fresh air fans so we take system 06-System 6—Pack

1
Mon Mar 21, 2016, 10:17 pm

Certification agency meeting the ISO Guidelines

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Stephanie Graham  on 

Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide

0

LEED NCv4 getting harder

NC-v4 SSc4:Rainwater management
posted by  Marco Valerio Ceccotti  on 

Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "natural land cove

1
Mon Mar 21, 2016, 5:32 pm

n/a

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Marco Valerio Ceccotti  on 

Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "natural land cove

0