Forum quick links
Extending the project boundary after Preliminary review
EBOM-2009 PIf4:Schedule and Overview Documentsposted by Szymon Zwoniarkiewicz on
We are in the process of pursuing LEED EBOM certification, for a project located in Europe. We have submitted the documentation for preliminary review.
Change energy consumption data after Preliminary review
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Szymon Zwoniarkiewicz on
We are in the process of pursuing LEED EBOM certification, for a project located in Europe. We have submitted the documentation for preliminary review.
revolving doors
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Anastasia Makarenko on
Dear all, could you please help me with the following question - on our project we have revolving doors with entryway systems installed, its diameter is 2,8 m.
Group Project - WEp1 & WEc3
Healthcare-v2009 WEp1:Water use reductionposted by Emily Hope on
In group projects, the WEp1 form requires data to be submitted separately for each project building.
Miles per gallon
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jennifer Webb on
Hello, We are conducting a survey with government employees and are trying to reduce the survey length as much as possible. Do miles per gallon (mpg) need to be included in the survey or would ma
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum Energy Performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Power Adjustment Percentages for Automatic Lighting Controls
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I am producing an energy model for a a refurbished building with a new lighting scheme. The installed LPD is 9 Watts /m2 using LED.
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .