Forum quick links
Putty in Paints
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Al Malik Diamla on
Good day everyone. I just wanted to ask in what product type is the putty that is being used in painting to level the surface. Thanks for the response
Recycled content in Steel frame of facade
NC-2009 MRc4:Recycled Contentposted by Indochine Engineering VN on
Hi, I would like to ask in case that facade manufacturer cannot confirm recycled content in their steel frame of facade, can I use default number 25% recycled content for steel product as stated in
SSpc14 Pilot Credit Review comments and feedback
Pilot-Credits PC14:Walkable Streetsposted by Vada Kornegay on
Part of my review comments were to provide,"evidence that a project team member has registered with LEEDuser and participated in the online Pilot Credit Forum" Does anyone know how to provide this
retail definition?
ND-Plan-v4 SLLc4:Bicycle facilitiesposted by Ian Scott on
I am curious what uses "retail" would include. Have searched for a definition but can't find one.
Reuse of aggregates
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Fareed Alghimlas on
The building our team is trying to get it LEED certified has originally a shallow swimming pool with stones and aggregates in it for decorative purposes, during the performance period, the buildin
Is waste heat district energy?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that use heat recovery chiller to recovery heat from the waste heat from a nearby data center.
IAQ Testing
posted by Roland Jones on
I have been asked to provide IAQ Testing for LDP, and am having trouble finding the distinctions between the normal pre-occupancy sampling for credit 3.2 and the during occupancy sampling of LDP.
Sub Metering of Service Hot Water (Domestic Hot Water)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.
Alternative Compliance Path
Schools-2009 SSp2:Environmental Site Assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.
Kitchen Supply AHU (For Make Up Air)
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
As part of a fit out I the only tenant AHU is for make up air in a Kitchen 2966.4 CFM Can anyone explain the approach to enter this is in LEED form.