Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline Envelope NonResi/Resi U-Values

NC-2009 EAp2:Minimum Energy Performance
posted by  Emir Pekdemir  on 

Our project is a multi-family residential project (8 stories) and we have modeled the baseline roof as a Residential, Insulation Above Deck U-Value per Table 5.5-1. We have received a LEED Review

1
Mon Dec 21, 2015, 10:54 pm

Baseline Envelope NonResi/Resi U-Values

NC-2009 EAp2:Minimum Energy Performance
posted by  Emir Pekdemir  on 

Our project is a multi-family residential project (8 stories) and we have modeled the baseline roof as a Residential, Insulation Above Deck U-Value per Table 5.5-1. We have received a LEED Review

0

Certifications other than GreenGuard

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Nilda De Coutte  on 

Hi, we´re working on an office project that is buying all new furniture and we were curious to know if furniture with other international certification like the "EU Ecolable" certificate, was appli

1
Mon Jan 11, 2016, 11:28 pm

LEED Design submital - First Review

General forums
posted by  Bridget Brock  on 

At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.

0

LEED Boundary for an Existing Multitenant Building

EBOM-2009 MPR3:Must use a reasonable site boundary
posted by  Gabriela Crespo  on 

Dear All, We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to participate in th

0

Peak discharge/flow rate

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  hana manai  on 

Which formula do you use to calculate peak flow rate (1 and 2-year, 24hours). I am using NRCS (SCS) TR-55 Graphical Discharge Method. Is that recommanded?

1
Mon Dec 28, 2015, 10:50 pm

Campus project (Master site) with 4 buildings

NC-2009 EAc2:On-Site Renewable Energy
posted by  Peg Manuel  on 

We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.

1
Wed Dec 23, 2015, 2:31 pm

Tenant Installed Equipment and Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  James Keohane  on 

I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.

1
Wed Dec 23, 2015, 5:35 pm

Water-Related Systems Implementation Phase

CS-v4 IPc1:Integrative process
posted by  Tyler Young  on 

I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.

1
Mon Dec 28, 2015, 10:34 pm