Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EQ PC 57 - French feedback

CS-2009 IDc1:Innovation in Design
posted by  Elodie DUMAS  on 

Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env

0

Withered grass

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gustavo De las Heras Izquierdo  on 

Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.

1
Fri Nov 27, 2015, 3:13 am

Substituting v2009 RP category for v4

NC-2009 RPc1:Regional Priority
posted by  Miriam Ramirez Baumgarten  on 

Hi! My project is a LEED NCv2009, I would like to know if it is possible to substitute the complete Regional Priority v2009 category for the Regional Priority v4 category? Thanks! Miriam

1
Tue Nov 10, 2015, 6:13 am

Calculating Ds for LEED 62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  William Beechinor  on 

Hello, I am currently trying to calculated Ds for the cooling condition for a project I an working on.

1
Thu Nov 5, 2015, 1:42 pm

Air cleaning for IEQc3.1 Construction IAQ management plan

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Marina Radchenko  on 

We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction: - no natural ventilation - no ventilation by permanent system - no any

1
Fri Nov 27, 2015, 8:20 pm

Partially demolished existing building

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Petra Hajná  on 

Our client has bought a lot with partially demolished existing building listed on national heritage fund list. So we need to preserve what has left - portion of exterior walls.

1
Thu Jan 19, 2017, 2:19 pm

n/a

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

Dear all, We are working on a mall with natural ventilation on the common areas (corridors).

0

[Innovation Credit] Bicycle Alternative

Schools-EBOM-v4 INc1:Innovation
posted by  JOHN COOK  on 

Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.

1
Tue Jan 17, 2017, 8:30 pm

[Innovation Credit] Bicycle Alternative

EBOM-v4 INc1:Innovation
posted by  JOHN COOK  on 

Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.

1
Thu Nov 12, 2015, 7:17 pm

LEED C&S project on our LEED ND site

ND-v2009 GIBp1:Certified green building
posted by  Gwen Corrie  on 

We have an approx. 6 acre block for our ND project, on which we have an existing hotel and two new condo towers with a retail podium.

1
Fri Nov 6, 2015, 5:36 pm