Forum quick links
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
Major renovation historic district includes off-site green area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Veronica Reed on
Hello We are working on a major renovation project on a 1890's historic building in a very dense historic district.
Chord diffusers for thermal control
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Lakshmi Suryan on
Hi all For credit compliance can ' Spigot damper with chord diffusers' be used for the rooms that are fed by a single FCU.
Planters for Roof garden & Nearest part of Building
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by SAMY Chamy on
As per local regulation Roof garden with grass, other trees using sand in roof is not allowed, Landscape near Building construction area is not allowed for this type of building can we use planter
Whole Building Energy Modeling Software
NC-2009 EAp2:Minimum Energy Performanceposted by Rick Alfandre on
Does anybody know if performing energy modeling using ComCheck satisfies the requirements for Whole Building Energy Simulation, or is something more extensive required?
Pedestrian walkways outside a kindergarden school
Schools-2009 PIf1:Minimum Program Requirementsposted by Devanand Ragbir on
The project is in Trinidad, Caribbean. There is a plan to construct a kindergarden school in a community which has been in existence for over 60 years.
A single big space which include several functions.
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I'm now working on a project under LEED NC certification. The ground floor includes a conference room, offices, technical spaces, meeting rooms, and one big space, in which the following f
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Certify some of multiple fitout floor
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by sompoche sirichote on
Our client will rent 8,10-20 floor within 20 stories building. They would like to get LEED CI certify only for 8 and 10 floor. Can it be done under single project certification?
Pump control using DES v2
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder how would I model the pump control for hot water and chilled water pump if Im using DES v2 option 1.