Forum quick links
Option B Calculator
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Haley Duncan on
Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?
School Expansion with Multiple Blocks
posted by Philippa Cameron on
Hi, We have a school expansion project to introduce a new middle school on a site which already has an existing primary and secondary school present.
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Graywater usage
Healthcare-v2009 WEp1:Water use reductionposted by Paula Hernandez on
Hi, Is it allowed to use treated graywater from lavatories and sinks for urinals and toilettes in Healthcare facilities?, Thank you
Dorm Room Controls, no mechanical cooling
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Michele Helou on
We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.
credits for zipcar, uber and shuttle bus
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Peter Doo on
Hi all, Our project is an outdoor amphitheater and we are looking to achieve some sort of credit under the SSc4 category.
Updated/clarified primer voc limit
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Martha Norbeck on
Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.
Energy Star Alternative
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?
EPD and MC02
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Guido Mattarello on
Hi all. I'm student working on a thesis about lca, epd and leed. The product under assessment is a unitized façade system. A façade-related EPD will be issued, once the building is complete.
Underground parking areas included?
posted by Maya Karkour on
Hello, We are trying to determine which rating system to use, NC or C&S, for a mixed use project.