Have there been concerns with safety when the credit calls for a main stairwell to be visible in the entry?

1
Mon Aug 24, 2015, 3:51 pm

Diverse Uses: Community Anchor Uses: Housing

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Kevin Dunphy  on 

I am looking to pursue the Option 2 "Diverse Uses" method.

1
Fri Aug 28, 2015, 9:42 pm

LEED EBOM Eligibility

EBOM-2009 PIf1:Minimum Program Requirements
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Wed Dec 30, 2015, 5:38 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

Industry definition of interconnecting stair?

Pilot-Credits EQpc78:Design for active occupants
posted by  Joanna Switzer  on 

Is anyone aware of a formal definition for this term? I was unsuccessful locating a reliable / official one. Thx!

0

Main entrance and LEED Project Boundary for Future Expansion

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Lourdes Salinas  on 

Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary.

1
Fri Nov 27, 2015, 2:30 pm

Meeting parking requirements for residential spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.

1
Fri Nov 27, 2015, 4:43 am

Appendix A envelope U-values in retrofit projects

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We are doing a project which is being 10% retrofitted. The reviewer wants us to used the envelope values before retrofitting as baseline and the new envelope properties as the proposed project.

1
Wed Aug 26, 2015, 8:17 pm

Move-in versus construction

LEED Rating System Selection
posted by  Mark Donahue  on 

Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?

1
Wed Aug 26, 2015, 9:35 pm

Water meter broke down during performance period

EBOM-2009 WEc1:Water Performance Measurement
posted by  Shakir Ismail  on 

We are working on a project where the building meter is owned by the utility authority.