Forum quick links
Electric Bike Storage
NC-v4 LTc6:Bicycle facilitiesposted by Irena Skoda on
Soon there will be a need to incorporate electric bikes and not just standard bike storage. Somewhat of a bigger space issue.
photocatalytic paint (TiO2) on Carpark Wall and Ceiling
CS-2009 IDc1:Innovation in Designposted by Wing Ho on
Our client is considering to apply photocatalytic paint (TiO2) on the project carpark wall and ceiling to reduce the NOx level and air pollutant.
For PI form 1 Table PIf 1-9
ND-v2009 PIf1:Development Program and Site Typeposted by Fai Leung on
How to count the number of buildings if multiple buildings share the same podium? For example: One Residential building and one office building are both constructed above the same mulit-floors sho
FTE calculations and bicycle parking
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Nicholas Klever on
I am working on certifying an addition to a military readiness center which operates drill weekends so the facility occupants greatly increases for 2 those 2 days each month.
shuttle bus to rail station
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Gail Napell on
we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.
ESC plan for Existing Building Minimal Sitework
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Annalise Reichert on
I am working on a project that encompasses the major renovation of an existing classroom/warehouse building.
EV charging stations VS energy model
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anya Fiechtl on
Have others on this forum documented electric vehicle charging stations in the energy model for EAp2 and EAc1? Any advice?
2 point minimum requirement
NC-2009 EAc1:Optimize Energy Performanceposted by Mike Stopka on
I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o
Process Load
NC-2009 EAc1:Optimize Energy Performanceposted by Muzammal Abbas on
Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce
IEQp1: Minimum Indoor Air Quality Performance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Arslan Faisal on
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.