Requirement to undertake a Survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Peter Gibney on
On our LEED project we are looking at Option 2 with our participation in a local, formal Commute Reduction Programme.
Example of a populated BPDO calculator fro LEEDv4?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jaspreet Pahwa on
Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are noted, compliance is met? Also h
U-value and SHGC for Baseline Fenestration in ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.
Fenestratin SHGC for EAp2 baseline and proposed building
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Thanks for the prompt and kind answer, Marcus. One more thing: Is it possible that baseline SHGC can be smaller than proposed one, even if both are below 0.25 (maximum)? Thanks
Recirculating airflow, table 6.4 and cold rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Rimbault on
Good morning everyone.
Calculating total energy use for RECs purchase
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Charalampos Giannikopoulos on
Since the RECs (or equivalent) needs to meet 100% of the building’s energy use (in case of pursuing 6 points) does this mean that we need to wait until full completion of the performance period in
Regularly Occupied Spaces in Convention Centers (LEED NC v2009)
NC-2009 PIf3:Occupant and Usage Dataposted by Megan White on
I want to confirm that Regularly Occupied Spaces in Convention Center projects are still defined as "Regularly occupied spaces are areas where one or more individuals normally spend time (more than
Where is the center of the ½-mile radius?
NC-2009 SSc2:Development Density and Community Connectivityposted by Jon Clifford on
Under the “Bird’s Eye View” tab above, in response to the FAQ, “Where do I draw the radius from?” it says, “Use the center of the LEED project boundary.” This same advice is in the LEEDuser “Missin
Example of a populated BPDO calculator with all tabs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jaspreet Pahwa on
Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are
Occupancy in the building
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alberto Cardenas on
My question is if the occupancy of the building is a single person in this case of an institution and has no tenants can apply for this credit.