Forum quick links
indoor smoking room exhaust
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Nicole Isk on
Hi, an occupant in our project building (office) insists on indoor smoking. He agreed to installing a cabin in his kitchenette (they already smoke there).
Retail (other than mall) or Enclosed Mall
Retail-CI-v2009 EAc5:On-site renewable energyposted by Geraldine Assmus on
I'm certifying a project which is located within a mall, it has access from the street and from inside the mall.
Treatment of shared chiller plant
posted by Scott McMillan on
We have a central chiller plant generating chilled water to serve a hotel and a convention centre. Only the convention centre will be seeking LEED certification under LEED NC 2009.
Submission through design review
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Charalampos Giannikopoulos on
Does the tenant design & construction guidelines (which is considered as a design credit) need to be finalized for review submission?
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Contact at USGBC regarding LEED ND
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Martine Desbois on
I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?
Protect Habitat on Campus
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
How to calculate Floor Area to be Ventilated?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.
IAQ calculator occupancy designations?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Patricia Andrasik on
I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)
Home size credit calculation
Homes-v4 EAp4:Home sizeposted by Jean Henderson on
Developing 130 unit condo project. 24 are 2 bdr (average size 36% below ES ref home). Rest are 1bdr (average size 24% below ES ref home).