Our project is a large medical campus with multiple buildings on a greenfield site. However, only one building on the site is seeking LEED certification, and so the LEED Project Boundary does not contain the entire medical campus. It only contains the land that directly supports the one building seeking LEED certification. The entire campus is being constructed concurrently, so there will be disturbance outside of the Project Boundary. Do we have to show that we followed the disturbance requirements on the entire campus or just the Project Boundary?