EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Charalampos Giannikopoulos on
Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre
Structures connected through a walkway
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Assesment rooms at rehabilitation Center
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.
Using microgrid battery storage to achieve demand response credi
Pilot-Credits EApc8:Demand responseposted by S. Sachs on
I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).
Medical records room with 7 cubicles.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?
Credit documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Charalampos Giannikopoulos on
For credit compliance using Option 3 - Approach 1 is any documentation other than the “EBOM SSc4 Alternative Transportation Survey Results Calculator” required? In addition, the "Sample SSc4 Survey
Workspace Pods
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Akos Brandecker on
Many of our clients are installing 'workspace pods' in their offices to encourage flexible working. These pods come in many shapes and sizes for individual/ group working, meeting spaces.
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
Doubt
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Hugo Pereira on
Hello there. My team and I are certifying a building in Brazilia, Brazil.