Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Policy goals

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Charalampos Giannikopoulos  on 

Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre

1
Mon Jun 29, 2015, 8:39 pm

Structures connected through a walkway

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.

0

Concrete Formwork

CS-2009 MRc5:Regional Materials
posted by  Mike Zupan  on 

Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!

1
Wed Jun 24, 2015, 11:53 pm

Assesment rooms at rehabilitation Center

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.

1
Fri Nov 27, 2015, 9:29 pm

Using microgrid battery storage to achieve demand response credi

Pilot-Credits EApc8:Demand response
posted by  S. Sachs  on 

I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).

1
Mon Mar 20, 2023, 8:55 pm

Medical records room with 7 cubicles.

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Saju Varghese  on 

I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?

1
Wed Jan 6, 2016, 6:44 pm

Credit documentation

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Charalampos Giannikopoulos  on 

For credit compliance using Option 3 - Approach 1 is any documentation other than the “EBOM SSc4 Alternative Transportation Survey Results Calculator” required? In addition, the "Sample SSc4 Survey

1
Tue Jun 30, 2015, 3:52 pm

Workspace Pods

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Akos Brandecker  on 

Many of our clients are installing 'workspace pods' in their offices to encourage flexible working. These pods come in many shapes and sizes for individual/ group working, meeting spaces.

1
Mon Jan 11, 2016, 10:54 pm

Performance Period

EBOM-v4 WEp2:Building-level water metering
posted by  Matthew Hanks  on 

I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?

1
Tue Jun 23, 2015, 12:56 pm

Doubt

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Hugo Pereira  on 

Hello there. My team and I are certifying a building in Brazilia, Brazil.

1
Wed Jun 24, 2015, 7:35 pm