Multiple Buildings Project Certification
CS-2009 PIf1:Minimum Program Requirementsposted by Mario S. on
We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro
3.2 at a Group Project
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Russell Remy on
I currently have a group project LEED-CI in which one building has changing facilities and showers meant for both building tenants use.
Utility sells "Community Solar" in yearly blocks - NOT Green-e
NC-2009 EAc6:Green powerposted by Joyce Kelly on
The local Utility sells "Community Solar" in yearly blocks - is NOT yet Green-e certified but willing to provide all the data required to be Green-e certified.
DOE Case Study - website?
posted by Peg Manuel on
In the past, the following website was an excellent place to upload a case study: US Department of Energy's Federal Energy Management Program "High Performance Federal Buildings Database" http://
the documentation language
NC-2009 SSc1:Site Selectionposted by ESRA OZKONUKSEVER on
hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.
Existing Blow-out toilets
CI-2009 WEc1:Water Use Reductionposted by Russell Philstrom on
Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
LEED for Homes MidRise and Commercial Condo Space
posted by Jennifer Preston on
First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.
LEED certification for part(s) of a hospital--op. rooms v. gar.?
Healthcare-v2009 PIf1:Minimum Program Requirementsposted by Robert Russo on
We are working with an existing hospital that would like to become LEED certified, but would like to LEED certify certain defined areas that are being renovated first--like the operating rooms.