Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Multiple Buildings Project Certification

CS-2009 PIf1:Minimum Program Requirements
posted by  Mario S.  on 

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro

0

3.2 at a Group Project

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Russell Remy  on 

I currently have a group project LEED-CI in which one building has changing facilities and showers meant for both building tenants use.

1
Wed Jun 17, 2015, 7:54 pm

Utility sells "Community Solar" in yearly blocks - NOT Green-e

NC-2009 EAc6:Green power
posted by  Joyce Kelly  on 

The local Utility sells "Community Solar" in yearly blocks - is NOT yet Green-e certified but willing to provide all the data required to be Green-e certified.

1
Thu Jun 18, 2015, 7:53 pm

DOE Case Study - website?

Credit Forums
posted by  Peg Manuel  on 

In the past, the following website was an excellent place to upload a case study: US Department of Energy's Federal Energy Management Program "High Performance Federal Buildings Database" http://

0

the documentation language

NC-2009 SSc1:Site Selection
posted by  ESRA OZKONUKSEVER  on 

hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.

1
Thu Jun 25, 2015, 8:39 pm

Existing Blow-out toilets

CI-2009 WEc1:Water Use Reduction
posted by  Russell Philstrom  on 

Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.

1
Wed Dec 30, 2015, 11:23 pm

Scope of the Pre-requisite in C&S Shopping mall

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.

1
Tue Jun 30, 2015, 8:19 pm

Scope in a C&S shopping mall

CS-2009 EAp2:Minimum Energy Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.

1
Fri Jun 19, 2015, 4:58 pm

LEED for Homes MidRise and Commercial Condo Space

LEED for Homes (LEED-H) Forum
posted by  Jennifer Preston  on 

First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.

1
Mon Jun 22, 2015, 1:39 pm

LEED certification for part(s) of a hospital--op. rooms v. gar.?

Healthcare-v2009 PIf1:Minimum Program Requirements
posted by  Robert Russo  on 

We are working with an existing hospital that would like to become LEED certified, but would like to LEED certify certain defined areas that are being renovated first--like the operating rooms.

1
Wed Dec 30, 2015, 5:49 pm