Forum quick links
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
LEED ND registration questions
ND-v2009 PIf2:Project Timelineposted by Gurpreet Misra on
1. Do we have to register projects under LEED ND V4 (it being released) or projects can still be registered under LEED ND 2009? 2.
Pantry in Office Building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omar Elrawy on
Dear all, I have a Pantry zone in an office building that is conditioned spearetely by a FCU. This zone has refrigerator, coffee maker, and recycling bins.
Energy and Water Data Reporting
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Yaneth Galindo on
I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to kno
Reclaim land for more than 40 years
NC-v4 MPR1:Must be in a permanent location on existing landposted by Michael Wahjudi on
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.
Is it ok to take out charge for changing facilities?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Maria Glädt on
Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.
Old concrete
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Maria Glädt on
Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?
Old sheet metal on roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Glädt on
Hi! The roof of our renovation project has is made of old sheet metal, which we do not know the SRI of.
#45 - Innovation or Pilot Credit
Pilot-Credits SSpc45:Site assessmentposted by Alicja Bieszyńska on
I noticed USGBC information "This pilot credit was closed to new pilot credit registrations on 3/1/2015.
Place of respite for staff
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Gustavo De las Heras Izquierdo on
It is not clear to me if the place of respite for the staff must also meet all the requirements listed in the credit.