Forum quick links
Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
With regard to Credit MRc1.1-Exisitng walls, floors and roof: I have a building which has a fake mansard around its perimeter.
Thermal Comfort - Verification
CS-2009 IEQc7:Thermal Comfort—Designposted by Garrett Ferguson on
Could IEQc8.1 Thermal Comfort - Verification be submitted as an ID credit for CS? I don't completely understand why it is not part of the CS system.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
Option 2 for a Partially Enclosed Building (LEED NCv2.2)
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by SIG - Sustainability Main Account on
We performed IAQ testing to meet IEQc3.2 on a subway station. The IAQ levels passed easily, and our approach was recognized by the LEED reviewer as an appropriate approach.
EA Pr2 Form V5 - EAp2-9
Schools-2009 EAp2:Minimum Energy Performanceposted by Robert Barrett on
My project does not comply with section 1.9A (minimum compliance requirements for process energy modeling) so I need to upload a narrative.
Ceramic Tile Reporting on LEED IEQ4.3 Form
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rachael Vidulich on
We have ceramic tile flooring on our project and I understand this is exempt from the testing requirements but do you need to list it on the IEQ4.3 form?
Camp Lemonnier - Naval Base in Djibouti, Africa
NC-2009 SSc1:Site Selectionposted by Peg Manuel on
We have a dormitory project at a US Naval Installation in Djibouti, Africa.
Option 4, Case 1, Path 2: No new parking
posted by Ricardo Sá on
What do you understand for "No parking will be provided or subsidized for tenant employees."?
Multiple tram lines stops within boundary
ND-v4 SLLc3:Access to quality transitposted by Philippa Cameron on
Hi, Our site has a number of tram stops located within the boundary and 1/4 mile from new and existing buildings, but only two service lines (one circular route in both directions and one east-wes
B-Corp Certification
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle DiPenti on
Does anyone know if USGBC will accept the B-Corp Certification for Option 1? Thank you!