Small Lab in Office w/ Multiple Controls
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Haley Duncan on
Hi, My project is a winery with a 300 square foot lab. There are three workstations, but only two employees work there most of the time.
10 existing villas project
posted by Adamantia Zisopoulou on
My project is an existing sea resort complex which consists of 10 villas with kitchens. Which LEED rating system can I use?
Centrifugal closed-circuit cooling tower minimun distances
NC-2009 IEQp1:Minimum IAQ Performanceposted by CT G on
Dear all, Do centrifugal closed-circuit cooling towers have to comply with table 5-1, of ASHRAE 62.1-2007? In our project, the closest distance from the cooling tower to the DOAS is 6 meters (hor
Tower’s Parking Located in a Non-LEED Podium’s Basement Parking
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Dei Dela cruz on
We have a Tower pursuing LEED NC certification being built on top of an existing Podium with basement parking. The Tower officially starts on top of the Podium.
Is this items means?
posted by shize zhang on
Is this item means onlly a building certified by ISO 50001 can apply for 1 credit in EA? Then how to apply for ACP? Thanks.
MRp2-2 : High Pressure Sodium Lamps
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Ashley Johnson on
There are no HPS lamps installed on our project so how do I close this part of the form so that I can check for compliance and submit? I just put "0" quantity but will that suffice?
CI: ID+C Project: Innovation in Design Credit
CI-2009 IDc1:Innovation in Designposted by Bridgett Weaver on
For an CI: ID+C Project Can you can earn / achieve innovation in design credit for following BD+C Enhanced Refrigerant protocols in CI project?
Credit Union
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Would a credit union work as a basic service in place of a bank?
<500 Miles
NC-2009 MRc5:Regional Materialsposted by Erika Duran on
Sometimes I receive a letter from a manufacturer stating that a material is harvested and manufactured within 500 miles of the project site however for proprietary reasons, they cannot disclose the
Needed Upload
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Omar Elrawy on
Dear all, I've got the following note during my preliminary design review: "2. Several spaces have not been included on the form (....).