Forum quick links
Information on denied credits?
posted by Stephen Buonopane on
Has USGBC/GBCI ever published any studies of denied credits? Typical total number for a project?
3 glazed panels - LEEDv2009
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by LEED Pro Consultant on
Hello, We have a layout configuration in which working spaces (offices) have glazed panels, allowing views to the exterior through other spaces that include also glazed panels.
LEED boundary for a railway station
NC-2009 PIf1:Minimum Program Requirementsposted by Juan Sergio Simborio on
LEED NC 2009 Our project is a major railway station in Qatar.
WEP1 for A project in Middle East
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ayda Sahaf on
The project I am working on is an office building located in middle east. the Washroom water closets all has water jets or a bun gun fixture for washing purpose instead of using toilet paper.
Acceptable methods of Glare Control
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Paul Rogers on
I know that glare control is a requirement for each window.
Bicycle & Changing rooms in basement , 200 yards
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Deepika Parmar on
Our project consists of three buildings connected through the basement and is registered under campus development. We are providing bicycle racks and shower changing rooms in the basement.
High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Lindsey Kindrat on
Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.
District virtual rate:
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).
Wastewater treatment plant offsite
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LEED Pro Consultant on
Hello all, We are working on an industrial facility project were the wastewater treatment plant is offsite the project.
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum Energy Performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even