NC-2009 IEQc8.2:Daylight and Views—Viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.
Water Quality
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Reference Building – Try #2
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Dirk Kestner on
Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.
50% periouvs paving
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Magda Aghababyan on
May be this is a very basic question. But I would like to know from you all, how can we determine whether a open grid paving block is 50% previous or not?
Indoor air quality test methods
NC-v4 EQc4:Indoor air quality assessmentposted by Tyler Zhu on
From my understanding, in order to pass the test for PM2.5 and PM10, EPA Compendium Method IP-10 has to be used.
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional Materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Integrated Project Team Members
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kim Lombard on
Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital.