Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Number of bus stops and bus lines required

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sarah Lavalliere  on 

There seem to be a slight difference in the wording between the English version of the LEED 2009 CS Canada reference guide and its French translation.

1
Fri Nov 27, 2015, 6:10 pm

MRc4 Recycled content

CI-2009 MRc4:Recycled Content
posted by  Lorissa Kimm  on 

How does one count the recycled content of fabrics used in furnishings? Do you have to separate out the cost of the fabric relative to the cost of the chair?

1
Sat Oct 4, 2014, 6:27 pm

Campus Site Lignting Calcs - again, sorry

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?

1
Mon Oct 6, 2014, 5:27 pm

Modeling pump, fan, COP

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.

1
Tue Oct 7, 2014, 1:20 pm

Attachments for the Resubmission

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  kelly ryan  on 

I am resubmitting a credit in response to LEED comments from the intial submission. The attachment file has been updated.

1
Tue Oct 7, 2014, 1:41 pm
1
Tue Oct 7, 2014, 3:20 pm

Major renovation energy model

NC-2009 EAc1:Optimize Energy Performance
posted by  Ron Dean  on 

I am working on the energy model of an renovated building, where only the structure will remain (LEED CS). It is located in a corner, attached to other buildings on both sides.

1
Tue Oct 7, 2014, 3:14 pm

Roof Area Clarification

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maggie Hogan Skaug  on 

Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".

1
Mon Nov 30, 2015, 11:20 pm

Ice Makers on LEED 2009 for Retail NC

Retail-NC-v2009 WEc3:Water use reduction
posted by  Nic Millard  on 

Are ice makers included in the WE 3 calculations since its Retail NC, we thought they were excluded for NC all together, but were not sure if this only applied to NC schools and core and shell.

1
Sat Aug 26, 2017, 11:56 pm

No Tenant Fit Out

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Kimberlyn Caoagas  on 

I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?

1
Wed Oct 8, 2014, 1:22 pm