Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interconnecting Staircase

Pilot-Credits EQpc78:Design for active occupants
posted by  Michelle DiPenti  on 

I have a question about optional requirement #3, "Provide accessibility to at least one open or interconnecting staircase to at least 50% of the tenant/occupant floors for convenient pedestrian ver

0

Expansion joints-LEED for schools v2009

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Stephanie Santiago  on 

For the expansion joints being used in a LEED project for schools v2009, do they have to meet the NRC requirement of 0.70? Currently our sub wants to use Seismic Colorseal, STC 52/OITC 38.

1
Wed Sep 24, 2014, 9:23 pm

Design System Primary supply Airflow (Vpsd)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Charalampos Giannikopoulos  on 

For a VAV (multiple-zone) system should the Design System Primary supply Airflow (Vpsd) sum up the total supply (and not the outdoor) air of each zone?

0

25ft of entrace located near corner of building

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mary Grace Wong  on 

Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?

1
Sat Aug 26, 2017, 3:39 pm

Modeling OA with Demand control ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have demand control ventilation for every AHU.

1
Thu Sep 25, 2014, 1:18 pm

Number of transients for FTE calculation

Calculating FTEs
posted by  Sunanda Swain, LEED AP BD+C, PQP  on 

Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.

1
Fri Sep 26, 2014, 12:46 pm

Non-default shower use

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project.

1
Thu Sep 25, 2014, 8:35 pm

Paking covering

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Julie Chagas  on 

Hi! My project will have a lot of parking spaces that cant be shaded by trees or with open grid pavement.

0

Need for consistent numbering system across all rating systems

General forums
posted by  Lyle Axelarris  on 

I definitely like having credit numbers as they save a lot of time in communication and reference.

1
Thu Sep 25, 2014, 10:20 pm

Mixed feelings about numbering

General forums
posted by  Andres Schwarz  on 

I have mixed feelings about this issue.

0