Question on commercial areas in a NC project

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  LEED Pro Consultant  on 

We are working with a project that will be a Bus Station, and it includes a building for the operation (waiting hall, offices, tickets) and a building for the drivers´ resting rooms, both joined by

1
Wed Jul 16, 2014, 8:28 pm

tenants guidelines

General forums
posted by  manuel de jesus gonzalez duron  on 

i have one doubt now the leed v4 is going to be official should a change my tenants guidelines strategy of comercial interior for the leed v4 instead of leed v3 ?

0

Fundamental Refrigerant Management: Leed v4- Campus Credit

EBOM-v4 EAp4:Fundamental refrigerant management
posted by  Patricia Andrasik  on 

We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.

1
Wed Jun 11, 2014, 4:54 pm

Baseline for Ventilation Fan unconditioned space?

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

What is the baseline for a ventilation fan providing outdoor air to an unconditioned space?

1
Wed Jun 11, 2014, 1:01 pm

Solar Powered Task Lighting

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Chris Brown  on 

Would Solar powered task lighting be acceptable for individual workstations in order to comply with this credit?

1
Wed Jun 11, 2014, 7:16 pm

IEQ Prerequisite 1 – Minimum Indoor Air Quality Performance

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Harsharan Kaur  on 

We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Pe

1
Wed Jun 11, 2014, 7:08 pm

copy paste

Retail-CI-v4 LTc5:Reduced parking footprint
posted by  manuel de jesus gonzalez duron  on 

this credit is the same has Access to quality transit

0

Energy Star's Portfolio Manager Tool

CS-2009 PIf1:Minimum Program Requirements
posted by  Kathryn Van Nelson  on 

Who exactly registers a project with Energy Star's Portfolio Manager Tool?

1
Mon Jan 19, 2015, 7:19 pm

Manufacturer Declaration

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lilian Seow  on 

The tile contractor says they can't disclose their floor tile and stone supplier information.

1
Sat Jul 26, 2014, 12:05 pm

parking rainwater

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  jorge calderon  on 

For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the

1
Wed Jul 2, 2014, 12:42 pm